O PROCESSO DE PROJETO COLABORATIVO APOIADO POR MEIOS DIGITAIS SOB À ÓTICA DA CIBERNÉTICA

Authors

  • Fernanda Aparecida Marino Ferrari
  • Lucas Edson de Chico
  • Anja Pratschke

Keywords:

Architecture Collaborative Design Process, BIM, Viable System Model, Complex System, Cybernetics

Abstract

This article proposes the use of a systemic organization method within a collaborative design process supported by a digital BIM platform. The systemic approach is based on the Viable System Model (VSM), developed by the English Management Cyberneticist Stafford Beer, which focuses on the organization of information and communication and its collaboration strategies during the different phases of a design process. The results presented are based on ongoing researches at the research group Nomads.usp, at University of São Paulo.

References

LEONARD, A.; BEER, S. The systems perspective: Methods and models for the future.

AC/UNU Millennium Project, Futures Research Methodology, 1994.

LU, W.; ZHAN, D.; ROWLINSO, S. How important is inter-organizational collaboration tothe success of cconstruction project BIM implementation. CIB World BuildingCongress [e-journal], 2013. Disponível em:<https://pdfs.semanticscholar.org/3a6b/8789e23e1bc7feb571fe78d330fcf695ffc3.pdf>. Acesso em: 29 jun. 2018.

MORIN, E. Introdução ao pensamento complexo. Porto Alegre: Sulina, 2007.

PRATSCHKE, A.; DI STASI, M. G. Qual cibernética é a parametrização? São Carlos:V!RUS, n. 11, 2015. Disponível em:<http://www.nomads.usp.br/virus/virus11/secs/nomads/virus_11_nomads_1_pt.pdf>.

PEREIRA, L. M.; HIROTA, E H; FABRICIO, M. M. Implicações organizacionais dacolaboração em BIM para a integração do processo de projeto. In Simpósiobrasileiro de qualidade do projeto no ambiente construído. João Pessoa: Anais... ePorto Alegre: ANTAC.p x-y, 2017.

PICKERING, A. The cybernetic brain: sketches of another future. The University ofChicago Press, 2010.

RIZZOLI, A. L.; SCHLINDWEIN, S. L. Modelo do sistema viável no Brasil: umlevantamento sobre sua aplicação. In Congresso brasileiro de sistemas. Poços deCaldas: Anais, 2012. Disponível em:<http://www.pucpcaldas.br/graduacao/administracao/revista/artigos/esp1_8cbs/06.pdf>. Acesso em: 15 ago. 2017.

SUCCAR, B. Building information modelling framework: a research and deliveryfoundation for industry stakeholders automation. In Construction, n. 18, p. 357 - 375,2009.

TRUSS, J.; CULLEN, C.; LEONARD, A. The coherence architecture of team syntegrity:from small to mega forms. 2000. Disponível em: <http://www.orga.unisb.

de/wiener_hp/scholz/pdf/TSI-Artikel.pdf>. Acesso em: 20 ago. 2016.

VALKENBURG, R.; DORST, K. The reflective practice of design teams. Design studies,v.19, n3, 1998.

Published

2018-11-12

How to Cite

FERRARI, Fernanda Aparecida Marino; CHICO, Lucas Edson de; PRATSCHKE, Anja. O PROCESSO DE PROJETO COLABORATIVO APOIADO POR MEIOS DIGITAIS SOB À ÓTICA DA CIBERNÉTICA. In: NATIONAL MEETING OF BUILT ENVIRONMENT TECHNOLOGY, 17., 2018. Anais [...]. Porto Alegre: ANTAC, 2018. p. 2485–2492. Disponível em: https://eventos.antac.org.br/index.php/entac/article/view/1646. Acesso em: 3 jul. 2024.

Similar Articles

<< < 11 12 13 14 15 16 17 18 19 20 > >> 

You may also start an advanced similarity search for this article.