Evaluation of the use of BIM in medium-sized works:
A case study
DOI:
https://doi.org/10.46421/entac.v19i1.2074Keywords:
BIM, Case study, midle size worksAbstract
This is a Case Study on the use of BIM for medium-sized works. Initially, a literature review was carried out, selecting relevant data on the implementation of BIM technology in Brazil and in the world. It presents the partial result of a scientific initiation project that involved a residential work, from conception to execution. It is concluded that BIM presents itself as a solution for this size of works and indicates several points that need to be improved in terms of project integration, labor for the execution of the work, as well as some aspects of logistics at the construction site.
References
ARROTÉIA, A. V.; FREITAS, R. C.; MELHADO, S. B. Barriers to BIM Adoption in Brazil. Front. Built Environ. 7:520154. doi: 10.3389/fbuil.2021.520154, 2021.
FREZATTI, F. Martins, D. B.; Mucci, D. M.; Lopes, P.A. Aprendizagem Baseada em Problemas (PBL): Uma solução para a aprendizagem na área de negócios. 1. ed. São Paulo: Atlas, 2018. v. 1. 148p.
HOSSEINI, M. R.; BANIHASHEMI, S.; CHILESHE, N.; NAMZADI, M. O.; UDAEJA, C.; RAMEEZDEEN, R.; MCCUEN, T. BIM adoption within Australian small and medium-sized enterprises (SMEs): An innovation diffusion model. Construction Economics and Building, p.76-86, 2016.
REIS, F. F. P. APLICAÇÃO DO BIM EM PROJETOS: estudo de caso em uma residência unifamiliar de pequeno porte. In: Gestão, Tecnologia e Ciências. v. 10 n. 33, 2021.
SILVA, P. H.; CRIPPA, J.; SCHEER, S. BIM 4D no planejamento de obras: detalhamento, benefícios e dificuldades. PARC Pesquisa em Arquitetura e Construção, Campinas, SP, v. 10, 2019.