ELECTRE III multi-criteria method for sorting project compression methods
DOI:
https://doi.org/10.46421/entac.v20i1.5755Keywords:
Project compression, ELECTRE III, OrdinationAbstract
The work is related to a problem of ordering four project compression methods, namely: fast tracking, overcrowding, overtime and shift work. The use of these methods aims to reduce the deadline for civil construction projects or recover the deadline for projects that are delayed. This research uses the real case of a 34.5/230kV Energy Collecting Substation and seeks to present an order from the best to the worst project compression method, taking into account the preferences of a decision maker. The four methods were evaluated in light of productivity, cost, work safety and quality criteria. The research was developed with the support of the ELECTRE III multi-criteria method. The results demonstrated that the fast tracking technique was the one that presented the best positioning, in ordering, among the set of techniques analyzed. Overcrowding and shift work came in second place. The use of overtime, in turn, took the last position in the order; being, therefore, the alternative with the least capacity to respond effectively to the analyzed criteria.
References
HANNA, A. S; TAYLOR, C. S.; SULLIVAN, K. T. Impact of extended overtime on construction labor productivity. Journal of
construction engineering and management, v. 131, n. 6, p. 734-739, jun 2005.
BALLESTEROS-PÉREZ, P. Modelling the Boundaries of Project Fast-tracking. Automation in Construction, v. 84, 231-41, 2017.
HANNA, A. S. et al. Shift work impact on construction labor productivity. In: CONSTRUCTION RESEARCH CONGRESS. Anais. San
Diego, 2005.
HANNA, A. S et al. Impact of Shift Work on Labor Productivity for Labor Intensive Contractor. Journal of construction engineering
and management, v. 134, n. 3, p. 197-204, 2008.
CHANG, C.; WOO, S. Critical Review of Previous Studies on Labor Productivity Loss due to Overtime. KSCE Journal of Civil
Engineering, v. 21, n.7, 2551-2557, 2017.
HANNA, A. S. et al. Overmanning impact construction labor productivity. In: CONSTRUCTION RESEARCH CONGRESS. Anais. San
Diego, 2005.
BALLESTEROS-PÉREZ, P.; ELAMROUSY, K. M.; GONZÁLEZ-CRUZ, M. C. Non-linear Time-cost Trade-off Models of Activity Crashing:
Application to Construction Scheduling and Project Compression with Fast-tracking. Automation in Construction, v. 97, 229-40,
BOGUS, S. M.; MOLENAAR, K. R.; DIEKMANN, J. E. Concurrent Engineering Approach to Reducing Design Delivery Time. Journal of
construction engineering and management, v. 131, n. 11, p. 1179-1185, 2005.
GOMES, L. F, A. M.; GOMES, C. F. S. Princípios e métodos para tomada de decisão. 6ª ed. São Paulo, Atlas, 2019.
MOTA, C. M. M.; ALMEIDA, A. T. Método Multicritério ELECTRE IV-H para priorização de atividades em projetos. Pesquisa
Operacional, v. 27, n. 2, p. 247-269, 2007.
INFANTE, C.; MENDONÇA, F. M.; VALLE, R. A. B. Análise de robustez com o método Electre III: o caso da região de Campo das
Vertentes em Minas Gerais. Gestão & Produção, São Carlos, v. 21, n. 2, p. 245-255, 2014.
FIGUEIRA, J.; ROY, V. M. Electre Methods. In: FIGUEIRA, J.; GRECO, S.; EHRGOTT, M. (Org). Multiple Criteria Decision Analysis: state
of the art surveys. Coimbra: 2005
HORA, H. R. M.; COSTA, H. G. O problema da inversão de ordens em métodos multicritério: um experimento com o ELECTRE III/IV.
In: SIMPÓSIO BRASILEIRO DE PESQUISA OPERACIONAL, 46. Anais. Porto Seguro, 2009.
CAMPOS, V. R. Modelo de apoio à decisão multicritério para priorização de projetos em saneamento. Tese (Doutorado em
Engenharia de Produção). Escola de Engenharia de São Carlos. Universidade de São Paulo, São Carlos, 2011.
CAMPOS, S. A. Análise comparativa de sistemas de vedações externas para edificações habitacionais com apoio à decisão
multicritério. 2019. 93 f. Dissertação (Mestrado em Engenharia Civil) – Centro de Tecnologia, Universidade Federal do Ceará,
Fortaleza, 2019.
HORA, H. R. M. et al. Análise de sensibilidade nos métodos Electre III-IV: um experimento com eliminação de alternativas. In:
ENCONTRO NACIONAL DE ENGENHARIA DE PRODUCÃO, 28. Anais. Rio de Janeiro, 2008.
MARZOUK, M. An Application of ELECTRE III to Contractor Selection. In: CONSTRUCTION RESEARCH CONGRESS. Anais. Banff, 2010.
GENERINO, R. C. M. Contribuição da abordagem multicritério na seleção de alternativas de reuso de água: aplicação em um caso
de irrigação agrícola e paisagística no Distrito Federal. 2006. Tese (Doutorado) – Universidade de São Paulo, São Paulo, 2006.
CARPINETTI, L. C. R. Notas de aula: EESC – Escola de engenharia de São Carlos. São Carlos: Universidade de São Paulo, 2020.
SABA, J. N. Proposta de aplicação do Electre III para ordenação dos modos de falha segundo os critérios da FMEA. 2020. 112f.
Dissertação (Mestrado em Engenharia de Produção) – Universidade de São Paulo, São Carlos, 2020.